Bel ons
+39 02 80 29 21Stuur ons een e-mail
logistics@dils.comVul het onderstaande formulier in voor meer informatie en we nemen contact met u op.
This logistics development, currently in its final stages and nearing completion, is located in the municipality of Vidigulfo (PV). Thanks to its strategic location, the property is easily accessible from the A7 Milan-Genoa motorway, exit "Binasco".
The development will involve the construction of two independent buildings, with the possibility of subdivision to ensure internal and external flexibility for potential tenant layouts. The flooring has been designed to support a load of 5 tons per square meter, allowing for easy movement of heavy equipment and vehicles. The extensive parking areas provide ample space for all loading, unloading, and goods handling activities. This Grade A asset will be LEED Gold certified and built according to the highest construction standards.
Typologie | Logistiek |
Voor-certificering | Ja |
Certificaten | LEED Gold |
Hoogte onder de balk | 12,00 m |
Sproeisysteem | ESFR/NFPA |
REI-structuur | 120 |
Ladingvloercapaciteit | 5 t/m² |
Naam | Oppervlak | Magazijnoppervlakken |
---|---|---|
Warehouse WHA | 22.095 m² | 25.028 m² |
Warehouse WHB | 2.258 m² | 91.557 m² |
Offices | 398 m² | — |
Gate House and technical areas | 277 m² | — |
Snelwegen | A7 Milan-Genoa 13 km |